And if no funds are allocated to it and no one is ordered to do it and if no scheduling of doing it exists, then, on each separate count it won't ever be done.

(b) The details of the thing itself, meaning a picture of it or its scope plus the ease or difficulty in doing it and with what persons or materials.

When and how they will be done and by whom has not been established, scheduled or authorized.

You could plan to make a million dollars but if when, how and who were not set as targets of different types, it just wouldn't happen.

A brilliant plan is drawn as to how to convert Boston Harbour into a fuel tanker area.

One could also have a plan which was targeted—who, when, how—and if the targets were poor or unreal, it would never be completed.

HUBBARD COMMUNICATIONS OFFICE

                  Saint Hill Manor, East Grinstead, Sussex


                    HCO POLICY LETTER OF 18 JANUARY 1969


                                  Issue II


                     (Reissued from Flag Order No. 1736,


                            same date and title)

Remimeo




                            PLANNING AND TARGETS



    (There are at this writing 3 HCO Pol Ltrs of near date on  this  subject
of Targets. The area has never before been  examined  or  written  up  as  a
philosophic subject.)

    Plans are NOT targets.

    All manner of plans can be drawn and can be okayed. But  this  does  not
authorize their execution. They are just plans. When and how  they  will  be
done and by whom has not been established, scheduled or authorized.

    This is why planning sometimes gets a bad name.

    You could plan to make a million dollars but if when, how and  who  were
not set as targets of different types, it just wouldn't happen. A  brilliant
plan is drawn as to how to convert Boston Harbour into a fuel  tanker  area.
It could be on drawings with everything perfectly  placed.  One  could  even
have models of it. Ten years go by and it has not  been  started  much  less
completed. You have seen such plans. World's Fairs are full of them.

    One could also have a plan which was targeted-who, when, how-and if  the
targets were poor or unreal, it would never be completed.

    One can also have a plan which had no CONDITIONAL TARGET ahead of it and
so no one really wanted it and it served no purpose really. It  is  unlikely
it would ever be finished. Such a thing existed in  Corfu.  It  was  a  half
completed Greek theatre which had just been left that way. No one had  asked
the inhabitants if they wanted it or if it was needed. So even  though  very
well planned and even partially targeted and half completed,  there  it  is-
half finished. And has remained that way.

    A plan, by which is meant the drawing or scale modeling  of  some  area,
project or thing, is of course a vital necessity  in  any  construction  and
construction fails without it. It can even be okayed as a plan.

    But if it was not the result of findings  of  a  Conditional  Target  (a
survey of what's needed or feasible) it will be useless  or  won't  fit  in.
And if no funds are allocated to it and no one is ordered to do  it  and  if
no scheduling of doing it exists, then, on  each  separate  count  it  won't
ever be done.

    One can define Planning as the overall target system wherein all targets
of all types are set. That would be complete planning.

                              COMPLETE PLANNING


    To get a Complete Plan okayed one would have to show it as:

    (a) A result of a  Conditional  Target  (survey  of  what's  wanted  and
    needed).

    (b) The details of the thing itself, meaning a  picture  of  it  or  its
    scope plus the ease or difficulty in doing it and with what  persons  or
    materials.